2005 Winter Task List for Sulehay Nature Reserve
Task list key: Tasks shown in grey text are complete.
Ref Task reference number (background highlighting indicates no date allocated to task)
Priority 1=highest (safety related), 5=lowest, 0=task not required
Grp SVG=Sulehay Volunteer Group, PCV=Peterborough Conservation Volunteers, CON=Contractor, WLT=awaiting Trust decision or action
Man Pwr Min number of people working in team
Nts Notes relating to task justification
Tools / Eqpmnt CS=Chainsaw+PPE, BC=Brush cutter+PPE, HT=Hand tools, H=herbicide+PPE, WS=Warning signs, M=Mower, HC=Hedge cutter,
TB=Tractor+Baler, TC=Tractor+Mower, TT=Tractor & trailer,
Man Days Estimated number of days required to complete task
Ref Pri-ority Grp Man Pwr Nts Task Tools / Equipment Man Days Date Completed
                 
1 1 SVG 1 1 EF. Keep roadside hedge cut low. HC 1 In progress
2 2 SVG 1 5 RH. Cut remaining area of Walden Hill TM 1 6-Sep-05
3 2 SVG 1 5 RH. Bale remaining area of Walden Hill TB 1 14-Sep-05
4 2 SVG 2 5 RH. Clear new bales from Walden Hill to Compost Hollow TT 1 14-Sep-05
5 2 SVG 2 5 RH. Clear old bales from Walden Hill to Compost Hollow TT 1 14-Sep-05
6 2 SVG 1 2, 5 SF Main Ride East. Mow ride side verges for width of 1 metre. Clear brash to suitable pile(s) inside wood. M or BC 1 17-Oct-05
7 2 SVG 1 2, 5 SF Main Ride West. Mow ride side verges for width of 1 metre. Clear brash to suitable pile(s) inside wood. M or BC 1 18-Oct-05
8 2 SVG 1 2, 5 SQ Main Ride. Mow ride side verges for width of 1 metre. Clear brash to suitable burn site inside quarry area. M or BC 1 17-Oct-05
9 2 SVG 2 2, 5 SF. Mow 2 metre wide path through Mucky Ride. Mow clearings along ride as previous year. Clear brash to pile inside wood. M or BC 1 20-Oct-05
10 2 SVG 1 2, 5 SQ. Mow west side path. Clear brash to burn site in quarry area. M or BC 0.5 17-Oct-05
11 2 SVG 2 5 RH. Cut Long Glade. Clear arising to burn site. M or BC 2 6-Oct-05
12 2 SVG 1 2, 5 RH. Mow paths through reserve areas - Walden Lane, Calcining Banks, Nassington Bottoms Close, Railway Cutting, Spur 1, Weighbridge Sidings. M or BC 1 3-Nov-05
13 2 WLT 1 5 RH. Harebell Corner. Cut and clear grass areas. Remove arisings to pile inside wood. M or BC 0.5 13-Oct-05
14 2 WLT 1 4 SF Scollop 1 annual mowing (grassland). Clear arisings to suitable pile inside wood. M or BC 0.25 13-Oct-05
15 2 WLT 1 4 SF Scollop 2 annual mowing (grassland). Clear arisings to suitable pile inside wood. M or BC 0.25 13-Oct-05
16 2 WLT 1 4 SF Scollop 4 bi-annual mowing (grassland). Clear arisings to suitable pile inside wood. M or BC 0.25 21-Nov-05
17 2 WLT 1 4 SF Scollop 6 bi-annual mowing (grassland). Clear arisings to suitable pile inside wood. M or BC 0.25 21-Nov-05
18 2 WLT 1 4 SF Scollop 11 bi-annual mowing (grassland). Clear arisings to suitable pile inside wood. M or BC 0.25 13-Oct-05
19 2 WLT 1 4 SF Scollop 12 annual mowing (grassland). Clear arisings to suitable pile inside wood. M or BC 0.25 13-Oct-05
20 2 WLT 1 4 SF Scollop 18 annual mowing (grassland). Clear arisings to suitable pile inside wood. M or BC 0.25 13-Oct-05
21 2 WLT 1 4 SF Scollop 34 bi-annual mowing (grassland). Clear arisings to suitable pile inside wood. M or BC 0.25 13-Oct-05
22 2 WLT 1 4 SF Scollop 37 bi-annual mowing (grassland). Clear arisings to suitable pile inside wood. M or BC 0.25 13-Oct-05
23 2 WLT 1 4 SF Scollop 41 bi-annual mowing (grassland). Clear arisings to suitable pile inside wood. M or BC 0.25 13-Oct-05
24 2 WLT 1 4 SF Scollop 43 bi-annual mowing (grassland). Clear arisings to suitable pile inside wood. M or BC 0.25 21-Nov-05
25 2 WLT 1 4 SF Scollop 47 bi-annual mowing (grassland). Clear arisings to suitable pile inside wood. M or BC 0.25 13-Oct-05
26 2 SVG 2 4 SF Scollop 8 four year coppicing. Clear brash to suitable pile inside wood. CS 0.5 21-Nov-05
27 2 SVG 2 4 SF Scollop 8 four year coppicing Clear brash to suitable pile inside wood. CS 0.5 21-Nov-05
28 2 SVG 2 4 SF Scollop 26 four year coppicing Clear brash to suitable pile inside wood. CS 0.5 17-Nov-05
29 2 SVG 2 4 SF Scollop 36 four year scrub coppicing Clear brash to suitable pile inside wood. CS 0.5 12-Dec-05
30 2 SVG 2 4 SF Scollop 39 four year scrub coppicing Clear brash to suitable pile inside wood. CS 0.5 12-Dec-05
31 2 SVG 2 4 SF Scollop 40 four year scrub coppicing Clear brash to suitable pile inside wood. CS 0.5 12-Dec-05
32 2 SVG 2 4 SF Scollop 49 bi-annual bramble slashers Clear brash to suitable pile inside wood. BC,HT 0.5 12-Dec-05
33 2 SVG 2 4 SF Scollop 50 50% coppice (2yr into four year cycle - first year missed Clear brash to suitable pile inside wood. CS 0.5  
34 2 SVG 2 4 SF Scollop 51 bi-annual bramble slashers Clear brash to suitable pile inside wood. BC,HT 0.5 12-Dec-05
35 2 SVG 2 4 SF Scollop 52 bi-annual bramble slashers Clear brash to suitable pile inside wood. BC,HT 0.5 12-Dec-05
36 2 SVG 2 2 SQ Main Ride. Clear bramble inside stock fencing. Clear brash to suitable burn site inside quarry area. BC,HT 2 21-Nov-05
37 2 SVG 1 2 SQ. Clear bramble and nettle spreading onto kissing gates. HT 0.5 16-Jan-06
38 2 SVG 1 7 SQ. Collect old logs and stumps and take to burn site in quarry area. TT 0.5  
39 2 SVG 2 5 RH. Cut Lower Wood Glade. Clear arisings to burn site. BC,HT 2 17-Nov-05
40 2 SVG 1 3 Check and improve security of pheasant pen netting in RH Upper Wood HT 0.5 13-Feb-06
41 2 SVG 1 2 RH. Clear bramble and nettle spreading onto kissing gates. HT 0.25 16-Jan-06
42 2 SVG 1 2 RH. Sammocks Hill West. Clear public footpath at NW corner. BC,HT 0.5 1-Dec-05
43 2 SVG 2 6 RH. Harebell Corner. Clear peripheral trees to bank. Create log pile; clear brash to burn site. LEAVE WAYFARING TREE. CS 1 28-Nov-05
44 2 SVG 2 5 RH. Paul's Glade. Cut and clear. Remove arisings to pile inside wood. BC 0.5 19-Dec-05
45 2 SVG 1 2 RH. Clear blackthorn obscuring Byway sign on track near lodge. Remove brash to pile in wood. CS 0.5 28-Nov-05
46 2 SVG 1 5 RH. Spur1. Clear existing small scollops on side of Spur1. Clear arisings to pile in nearby scrub. BC 0.5 3-Nov-05
47 2 SVG 2 2 RH. Check and adjust all field gates for operation and security. Advise WLT of security issues. HT 1  
48 0 SVG 2 6 RH. In quarry area, remove re-growth and treat birch stumps with appropriate killer. Remove arising to suitable pile(s) inside wood. CS,HT 0.5  
49 0 SVG 2 6 SQ. Remove birch and sycamore re-growth, and treat stumps with appropriate killer. Remove arising to suitable burn site inside quarry area. CS,HT 0.5  
50 3 SVG 2 5 RH. Cut a 20% area of the Calcining Banks on the west side. Rake off and remove arisings to Compost Hollow. TM, BC, HT, TT 2 22-Sep-05
51 3 SVG 1 7 RH. Clear pheasant pen netting on Rail Track Spur 1. TT 0.25 13-Mar-06
52 3 SVG 1   SF & SQ. Check and empty dormouse boxes (with Ms Crawthorne) HT 0.5 18-Oct-05
53 3 SVG 1 7 SF. Fit 'no horse riding' signs at tracks leading off bridleways. HT 0.5  
54 3 SVG 2 8 RH. Paul's Glade. Clear access track through to glade from east end of Long Glade. CS,HT 2 28-Nov-05
55 3 SVG 2 6 RH. Paul's Glade. Clear peripheral trees on south and east side to permit more sunlight. Create log and brash piles. CS,HT 2 19-Dec-05
56 3 SVG 1 5 RH. Weighbridge Sidings. Clear bramble patches. Clear arisings to Compost Hollow. BC 1 3-Nov-05
57 3 PCV 2 9 SQ. Clear ash and birch in NE corner. Creat log pile. Clear brash to burn site. CS,HT 2 18-Sep-05
58 3 SVG 2 2 RH. Install fencing near kissing gate from Sulehay Road to prevent access except by using gate. HT 2 6-Feb-06
59 3 SVG 2 9 SQ. Clear bamble and scrub on south facing bank along north path. Clear brash to burn site in quarry area. HT 2 13-Feb-06
60 3 SVG 2 6 RH. Clear overhanging scriub and bramble to side of Walden Lane. Clear brash to piles in wooded area between Walden Lane and Byway. HT 2 13-Mar-06
61 3 SVG 2 6 SF. Mucky Ride. Clear overhanging scrub on south side of ride, particularly at eastern end. Clear brash to piles in wood. HT 2 27-Feb-06
62 4 SVG 1 5 EF. Cover ragwort pile with tarpaulin to encourage composting. TT 0.5  
63 4 SVG 1 7 SF. Replace missing scallop marker posts. Re-number all posts to make clearer from bridleway. HT 1 2-Jan-06
64 4 SVG 2 3 RH pheasant pen.Coppice/clear trees in the area previously cleared of scrub. Create log and brash pile. CS,HT 3 13-Feb-06
65 4 SVG 1 7 RH. Clear posts near FP between Nassington Bottoms Close and Calcining Banks. TT 0.25  
66 4 SVG 1 7 RH. Map new fence line on east side Nassinton Bottoms Mire HT 0.5  
67 4 PCV 1   SF. Continue repair to drystone wall on SF east side HT    
68 4 SVG 1 7 RH. Burn brash collected from clearing activities in Lower Wood Glade. [Cleared to compost area instead.] HT 0.5 10-Nov-05
69 4 SVG 1 7 RH. Burn arisings from Long Glade and brash from Harebell Corner. HT 0.5 28-Nov-05
70 4 SVG 1 7 SQ. Burn brash collected from clearing activities. HT 0.5  
71 4 SVG 1 7 RH. Burn brash in Nassington Bottoms Close left from previous year. HT 0.5 13-Mar-06
72 0 SVG 2 5 RH. Cut Nassington Bottoms Close. Bale and remove arisings to Compost Hollow. TM,TB,TT 1  
73 0 SVG 2 5 EF. Cut, bale and remove bales to RH compost hollow. TM,TB,TT 2  
74 0 SVG 2 6 EF. Clear bramble & hawthorn encroachment from forest edge into field. BC,TT 2  
    WLT     RH. Spot weed ragwort on Sammocks Hill East      
    WLT     RH. Spot weed ragwort on Sammocks Hill West      
    WLT     RH. Spot weed ragwort on Walden Hill      
    WLT     RH. Spot weed ragwort on Calcining Banks north/east corner      
    WLT     RH. Spot weed ragwort on Nasington Bottoms Close      
    WLT     EF. Spot weed ragwort      
    CON     RH. Check stock fencing and gates are secure on Sammocks Hill West      
    CON     RH. Check stock fencing and gates are secure on Sammocks Hill East      
    CON     EF. Check stock fencing and gates are secure - loose posts, loss of wire tension, add barbed wire.      
    CON     SQ. Check stock fencing and gates are secure.      
                 
Total man-days estimated for all tasks: 62.25
Notes
1 Work required to improve safety for visitors
2 Public access & footpaths to be kept clear.
3 Management plan for reserve includes the use of the existing pheasant pen as a deer free area for coppicing (with due consideration given to requirements of black hairstreak butterfly) - fence integrity must be maintained to ensure the area remains deer free.
4 Sulehay management plan includes multi-year program of ride side scollop clearing.
5 In order to maintain valuble limestone grassland habitat, these areas to be cut and cleared anually, and kept clear of scrub and trees
6 Encroachment of scrub onto grassland habitat to be restricted and reversed where appropriate.
7 General tidying exercise, bringing re-useable materials to the storage area next to the tool store
8 Access tracks to be kept clear for site maintenance
9 Required as part of management plan to preserve habitat for skippers recorded in this area
Tasks sorted by proposed implementation date
03/10/2005
10/10/2005
17/10/2005
24/10/2005
07/11/2005
14/11/2005
21/11/2005
28/11/2005
05/12/2005
12/12/2005
19/12/2005
    26/12/2005
02/01/2006
09/01/2006
16/01/2006
23/01/2006
30/01/2006
06/02/2006
13/02/2006
20/02/2006
27/02/2006
06/03/2006
13/03/2006
20/03/2006
27/03/2006
03/04/2006
10/04/2006
  17/04/2006
24/04/2006
01/05/2006