2007 Summer Task List for Sulehay Nature Reserve
Task list key: Tasks shown in grey text are complete.
Ref Task reference number (background highlighting: blue - winter only task; yellow - winter or summer task)
Priority 1=highest (safety related), 5=lowest, 0=task not required, S=Summer program, G=Group task.
Grp SVG=Sulehay Volunteer Group, PCV=Peterborough Conservation Volunteers, CON=Contractor, WLT=awaiting Trust decision or action
Days Estimated number of days required to complete task.
Ref Pri-ority Grp Location Tasks
(preliminary - to be agreed)
Days Date Complete or Planned
             
1 1 WLT EF Monthly, keep roadside hedge cut low. 6 18-Jun-07
2 3 SVG EF Re-install stock fencing around EF. Advise WLT of materials required, or re-charge for materials used.  5  
3 4 SVG EF Clear pile of dead ragwort to compost hollow in RH (or burn in situ). 0.25  
4 4 SVG EF Stock fence in SW and NE corner. Top wire requires re-fixing. 0.25  
5 5 SVG EF Map EF ragwort coverage. 0.5 17-Jul-07
6 2 SVG RH Mow all paths 1 11-Jun-07
7 2 SVG RH Kissing gate. Clear nettle and bramble at kissing gate behind tool store. Clear to Compost Hollow. 0.25 13-Aug-07
8 2 SVG RH Kissing gate. Clear nettle and bramble at kissing gate between Lower Quarry and Byway. Clear to Compost Hollow. 0.25 13-Aug-07
9 2 SVG RH Kissing gate. Clear nettle at kissing gate leading from Byway towards Calcining Banks. Clear to Compost Hollow. 0.25  
10 2 SVG RH Build and install 'Rutland' gate in stock fencing on Walden hill to provide access to Compost Hollow. Advise WLT of materials required, or re-charge for materials used. 1 12-Mar-07
11 3 SVG RH Long Glade. Keep bramble cut back. 1  
12 3 SVG RH Lower Wood Glade. Keep bramble cut back. 1  
13 3 SVG RH Walden Hill. Clear growth spreading across west side stock fence. 1 26-Mar-07
14 3 SVG RH Weighbridge Sidings. Cut and clear as in previous years. Clear to Compost Hollow. 1  
15 3 SVG RH Re-install field gate and posts into Nassington Bottoms Mire. Install new strainer posts to support stock fencing. Check with WLT if 'Rutland Gate' can be used here. Advise WLT of materials required, or re-charge for materials used. 2 9-Jul-07
16 3 WLT RH Consider weed wiping for ragwort control on Walden Hill, Sammocks Hill East and Nassington Bottoms Close.    
17 3 SVG RH Collect bowser from Sammocks Hill, and store in lean-to 0.5 12-Mar-07
18 3 SVG RH Map RH ragwort coverage. 1 In progress
19 3 SVG RH Pull ragwort on Spur 1. Clear to Compost Hollow. 1 30-Jul-07
20 3 SVG RH Pull ragwort on Weighbridge Sidings. Clear to Compost Hollow. 1 30-Jul-07
21 3 SVG RH Pull ragwort on Lower Quarry. Clear to Compost Hollow. 0.5 NA
22 3 SVG RH Pull ragwort on Upper Quarry. Clear to Compost Hollow. 0.5 NA
23 3 SVG RH Pull ragwort on Long Glade. Clear to Compost Hollow. 0.5 NA
24 3 SVG RH Pull ragwort on Harebell Corner. Clear to Compost Hollow. 0.5 NA
25 3 SVG RH Fit chain and lock to inhibit un-authorised opening of 'Rutlan Gate' into Compost Hollow. Advise WLT of materials required, or re-charge for materials used. 0.25 29-Apr-07
26 3 SVG RH Kissing gate from byway leading to Calcining Banks. Re-fit gate so that it cannot be lifted off hinges. Fit replacement closing spring. Advise WLT of materials required, or re-charge for materials used. 0.5  
27 4 SVG RH Walden Hill. Re-fix stock fencing - will required new straining posts where kissing gate was inserted. Advise WLT of materials required. 3 23-Apr-07
28 4 SVG RH Walden Hill. Check with WLT if this is required. Fix barbed wire to west side stock fence. Advise WLT of materials required. 1 23-Apr-07
29 4 SVG RH Fit 'no horse riding' signs at tracks leading off byway. 0.25  
30 4 SVG RH Fit 'no horse riding' signs to west of Quarry Road North near gate from Sulehay Road. Use brash to restrict access. 0.5  
31 4 SVG RH Pheasant pen. Check perimeter fencing and gates. Repair as necessary. Clear area of deer. 0.5 18-Jun-07
32 4 SVG RH Pheasant pen. Clear path inside and outside fence perimenter to allow easy maintenance. 1  
33 4 SVG RH Pheasant pen. Mow bracken area after initial growth. Clear to compost site. 0.25 4-Jun-07
34 Pheasant pen. Mow bracken area after second growth. Clear to compost site. 0.25  
35 4 SVG RH Bracken Wood. Mow bracken area to south of pheasant pen after initial growth. Clear to compost site. 0.5 25-Jun-07
36 Bracken Wood. Mow bracken area to south of pheasant pen after second growth. Clear to compost site. 0.5  
37 4 SVG RH Build section of fencing with stile (or narrow pedestrian gap) at footpath leading off Byway (between Bracken Wood and Nightingale Scrub). Advise WLT of materials required, or re-charge for materials used. 2  
38 4 SVG RH Re-install field gate and posts at south end of Quarry Road South. 1  
39 4 SVG RH Install field gate at south end Walden Lane. Advise WLT of materials required. 1 4-Jun-07
40 Install kissing gate for pedestrian access next to field gate at south end Walden Lane. Advise WLT of materials required. 1 4-Jun-07
41 4 SVG RH Investigate options and costs to improve track drainage near Harebell Corner, Upper Quarry and Lower Quarry. 0.5  
42 4 SVG RH Re-organise tool store to take seed harvester in addition to existing equipment 0.5 5-Mar-07
43 4 SVG RH Re-organise and tidy lean-to. 0.5  
44 4 SVG RH Install lockable handgate between Spur1 and Lower Wood Glade. Advise WLT of materials required, or re-charge for materials used. 1  
45 4 SVG RH Upper Quarry. Clear arrisings from winter clearing work to Compost Hollow. 0.25  
46 5 SVG RH Map new fence line on east side Nassington Bottoms Mire 0.5  
47 5 SVG RH Map RH bluebell coverage 1  
48 0 WLT SF Identify suitable area(s) of woodland for coppicing to create varied habitat (woodland clearings). WLT to discuss with 'Natural England' ref SSSI.    
49 3 SVG SF Install posts, and fit 'no horse riding' signs at tracks leading off bridleways. 0.5  
50 3 SVG SF Mucky Ride. Re-fix loose interpretation board at south end of ride. 0.5  
51 4 SVG SF Clear old pheasant pen posts, netting and palettes to RH storage area. 1 In progress
52 4 SVG SF Clear remaining post and rail fencing materials to RH storage area. 0.5 16-Apr-07
53 4 SVG SF Construct dead hedging on boundary to block access between Kings Oaks and adjacent quarry. 2  
54 4 SVG SF Clear tree guards around tree bases in Cow Wood (3 trees affected). 0.25  
55 4 SVG SF Cut back sycamore re-growth in area previously cleared in Yarwell Quarter. Continue to clear sycamore saplings throughout Yarwell Quarter. Clear to local bash pile. 2 In progress
56 4 SVG SF Dis-mantle 'shelter' in Kings Oaks, and remove materials to RH store. 0.5 16-Apr-07
57 5 SVG SF Map SF bluebell coverage 1  
58 5 SVG SF Map SF wood anemone coverage 1  
59 5   SF Clear old bottles and glass debris from west end Cow Wood.    
60 5 PCV SF Continue repair to dry stone wall on SF east side 1  
61 2 SVG SQ Kissing gate. Keep bramble (etc) clear at access to Bridleway from opposite Sulehay Lodge. Clear brash to local burn site. 0.25 13-Aug-07
62 2 SVG SQ Kissing gate. Keep bramble (etc) clear at access to SQ from Sulehay road. Clear brash to local burn site. 0.5 13-Aug-07
63 3 SVG SQ In March/April only. Mow Fairy Flax area to cut back bramble and coarse vegetation. Rake and clear to burn site. 1  
64 3 SVG SQ Map SQ ragwort coverage. 0.5 16-Jul-07
65 3 SVG SQ Pull ragwort througout quarry area. Clear to Compost Hollow. 1 NA
66 4 SVG SQ Clear birch saplings at west end of Middle Path. Clear brash to burn site. 0.5 12-Mar-07
67 4 PCV SQ Clear birch saplings/trees to south of Bareground Bottom and on West Bank. Clear brash to burn site. 1 25-Mar-07
68 4 SVG SQ Collect old logs and stumps and take to burn site in quarry area. 0.5  
69 4 SVG SQ Cut back sycamore re-growth. Treat stumps to inhibit future re-growth. Clear to local burn site. 0.25 13-Aug-07
70 4 SVG SQ Kissing gate. Repair kissing gate leading into SQ from Quarry Ride (east end).  Advise WLT of materials required, or re-charge for materials used. 2  
71 4 SVG SQ Kissing gates. Fit closing spring on all three kissing gates. Fit gate catch on kissing gate at west end Stonepit Quarry Ride.  Advise WLT of materials required, or re-charge for materials used. 1  
72 5 SVG SQ Burn brash and arisings collected from clearing activities. 0.5  
73 2 SVG RH Level access path to lodge 0.5 9-Jul-07
74 2 SVG RH Repair stock fencing in SHE 1 30-Apr-07
75 3 SVG RH Replace stock fencing in SW corner of Walden Hill (adjacent to FP) 1 14-Jun-07
76 4 SVG RH Mark out areas of Calcining Banks for 4 year cut & clear cycle 0.5  
77 3 SVG EF Pull ragwort 5 In progress
Total days estimated for all tasks: 71.25